首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
Based on road design information, we derived coordinates of arbitrary points in the pile and cross sectional azimuth which may guide global positioning system (GPS) surveying in section surveys. Also, we introduced Windows CE technology into the measurement process, using embedded programming for the GPS real time data process. It emphasizes designing the functional components of GPS data communications, data displays and cross sectional surveys. The software system may be used to produce the liberal station, real time dynamic display, and indoor and outdoor work processing. This system has been used in the Shanghai Chengdu West Road Item. The results show that the integrated system of indoor and outdoor works for real time kinematic (RTK) surveying in a mountain highway could simultaneously process indoor surveys and outdoor data.  相似文献   

2.
The intense coupled and nonlinear behaviors were observed on the tall long span tower line systems which were under the icing and wind loads in heavy icing areas. A set of stiffness equations of insulator, conductor and boundary conditions was deduced. Taking the ±800 kV UHV DC transmission line from Xiangjiaba to Shanghai as an example, the simplified numerical model of transmission tower, conductor, insulator and constraint was developed. The long span transmission tower line system models under seven loads conditions were analyzed by static nonlinear methods. It was found that the P Δ effect of tower components was small when the covered ice was uniformly distributed. The unbalanced wire loads on the tower would lead to twist effect when the covered ice was uneven distributed. The axial forces, moments at restraint nodes and the longest cantilever member were greatly affected by the P Δ effect, under which the unfavorable effect on the structure should be considered.  相似文献   

3.
In millisecond blast engineering,the key to achieving millisecond blast is to ascertain reasonable delay time interval.Firstly,the authors make use of time-energy density analysis based on wavelet transform,and get the real delay time by identifying the blast moment of short-delay detonators.Secondly,every sub-signal is separated from measured millisecond blast vibration signal by time-frequency domain transform techniques.Lastly,the Optimized delay time interval is obtained by comparing the superposition effect of sub-signal in different delay time interval.The effectiveness of the proposed method is verified with time-energy density analysis of millisecond blasting vibration signals in an underground project.It shows a high theoretical and practical value,and establishes a theoretical and technical foundation for the study of controlling and forecasting blast vibration damage.  相似文献   

4.
In this thesis,aiming at the characteristic of operation directing expert systems,we use the state of process characteristic parameter to describe the process condition(state).We propose a solving strategy batal on characteristic model.According to the solving-tree of process condition (state),the present process state can be obtained. An example of application illustrates that this method solves problem quickly and satisfy the real time directing operation.  相似文献   

5.
The device developed is a detecting system automatically monitoring the operation state of an infusion pump unit in oil fields. It provides drawings, real time display and timely print of the 42 operation parameters such as production rate and so on. Sound and light warnings are also available. This research project was honored the second prize of progress in science and Technolog in 1988 by the state education comission.  相似文献   

6.
For the requirement of building up the battery management system (BMS) of hybrid vehicles(HEVs), the real time measurement and estimation of charge (SOC) of the Ni MH batteries are investigated, because the popular SOC definition is unsuitable under the condition of variable current discharge. The origin of this kind unsuitability are analyzed ,and the characteristics and existing problems of different kinds of SOC measuring methods are compared. On the basis of mentioned above, some corrections are given to the popular SOC definition, and the new conception of SOC is proposed. The corrected definition of SOC is suitable for the real time SOC estimation under the variable current condition of the batteries used in HEVs. Based on the corrected SOC definition, the computational model of the new SOC is built and simulated. Satisfactory result has been obtained from comparisons of the simulating results, which shows that the theoretical model provides a basis for optimizing the adaptation of power system to the hybrid vehicles (HEVs).  相似文献   

7.
This paper proposes an expert control system for industrial processes on-line control and supervision by combining expert system techniques with computer process control techniques, introduces the fundamental design principles,basic structure and engineering implementation of this real time expert control system and gives the field operation results concerning the processing of a sodium chromate rotary kiln controlled by this expert control system as an application example.  相似文献   

8.
To accurately simulate prestressed construction process of large-span suspendome, the initial state of construction process according to practical construction sequence is established, and the construction mechanical analysis for prestressed construction process is especially studied. Features of prestressed construction process of large-span suspendome are summarized, and the insufficiencies of the application of state variable superposition method, back analysis method, birth and death element method are analyzed. Combined with nonlinear finite element analysis method, forward algorithm for prestressed construction process based on the equivalent pre-tension is proposed, and the specific application method and procedure are given. Changzhou stadium steel roof engineering is taken as an example to verify the practicability and applicability of forward algorithm for prestressed construction process. The conclusion is that, using forward algorithm for prestressed construction process based on the equivalent pre-tension, the structure state of each construction phase can be accurately tracked, and the nonlinear contact of strut and rigid framework, interactive impact of cable force, conversion of temporary structure system, and structural geometric nonlinearity can be comprehensively considered.  相似文献   

9.
An improved predictive control method is presented to compensate the random time delay in the networked control system. The feedback time delay is compensated by predictive controller based on softened increment input strategy. The forward time delay is unknown for controller, so an extra feedback loop is added to compensate the delay by estimating the error between the actual control signal effected on plant and the output of controller in historical moment. For the controlled system with unknown or slowly varying parameters, the networked feedback correction algorithm is discussed based on a modified recursive least-squares identi cation algorithm. The system stability is analyzed and the simulation results show that the time delay in the networked control system can be accurately compensated. The excellent network performance is ensured with this strategy.  相似文献   

10.
The double drive hoist reducer developed in the planetary gear is a new generation of energy saving and environment protecting hoist product. The multi flow transmission system theory of hoist is analyzed. With the theory and method of bond graph,a bond graph model with coupled vibration is established for hoist multi flow transmission system for the first time. The state equation of the system is developed and dynamic simulation analysis is also carried out. The internal changing law and relationship of the system for the state variable are got. Therefore, the dynamic properties and gearing features of this system are revealed comprehensively. The research results can provide the dynamic analysis method and design basis for multi flow transmission system of hoist.  相似文献   

11.
The traditional scheduling for vehicle is option in the fixed network. But it can't satisfy the real time environment. The demand of order is changeable and uncertain in real environment. It is convenient for scheduling transforming it into static data, but can't get the advantage on time. This paper proposes a real time vehicle scheduling on the study of traditional scheduling and discusses the model structure and the key technology for the real time system that establishes the base for develop teal time system.  相似文献   

12.
This paper presents a new hierarchical and coordinative control method for reactive power optimization in large-scale interconnected power systems. It combines the interconnection forecast method for hierarchical control in large-scale steady state industrial systems with the incremental linear programming method for reactive power optimization in real time. The results of applying the method to power system examples show that the method not only solves the problem of high dimension in order, but also keeps the advantages of the incremental linear programming method. The proposed method is also suitable for the security analysis of reactive power correction in large-scale interconnected power systems.  相似文献   

13.
The load changed of motor affects normal run. If it is not adjusted, the state of motor will become poor, while it affects steady of the system. This paper presents an efficient method for the motor speed controlling, it applies Tacagi-Sugeno's method that each linear submodels are connected for fuzzy algorithm, an algorithm of the fuzzy model identifying and fuzzy control is fulfilled through whole nonlinear model which are replaced with local linear models. It makes speed of motor to maintain steady, and variable structure control is applied to guarantee performance of dynamic flowing for process controlled, the design of stability and robustness is proposed in the scheme. Practice running results show that it is efficient that uncertain dynamic processes are controlled.  相似文献   

14.
The impulse value of a impulse mechanism has a notable influence on the dynamics capability of impulse variable speed device. Basing on this point, the authors take crank-rocker mechanism in series with slider-crank mechanism as impulse mechanism when we design the impulse variable speed device. The link used to adjust the speed is applied in slider-crank mechanism which has no quick-return characteristic, so the advance-to return-time ratio keeps stable when we adjust its speed. The speed fluctuation also keeps invariable. The new method overcome the default that this kind of impulse variable speed device has a notable speed fluctuation. At the same time, ADAMS software is used to optimize and show the real motion law. From the simulation result we can get the speed fluctuation is down to 18% in the whole process. The change of speed fluctuation is down to 1%. The result is better than other mechanism like this category.  相似文献   

15.
A digital detecting system of the dielectric loss in the capacitive equipment is introduced based on virtual instruments.This system can real-time collect,analyze,process and storage electrical signals with National Instruments' program LabVIEW and ADLINK,s DAQ board.Through the simulation test in lab and the real test in electric substation,it is shown that this system has high accuracy on testing the dielectric loss in the capacitive equipment,the real test data is stable and the relative error of real dielectric loss is less than 5%.It is to say that this system can meet the requirement of the real on-line monitoring.  相似文献   

16.
The paper provides a detailed study of switching conditions of minimum-time control systems based on application in engineering. By analysis in theory and experiment, the authors deduce a set of switching conditions with state and control variabes inequality constraints, the variations of system parameters and the time-delay of computer in real time control. As an example, a DC motor speed control system is considered. By digital simulation and physical experiments,these conditions proved to be correct. The method in this paper is also suitable for other control systems using compound control algorithm.  相似文献   

17.
This paper reports on application of network flow programming to the real power economic redispatch with security constraints. For the contingency state which violates the line security constraints , the re-dispatching is performed by eliminating the curtailment of real loads. The network flow model is incremental, and is solved by OKA. Therefore, it is very simple, fast and accurate. The model and its solution algorithm are tested on JEEE 30 bus system and the encouraging results are obtained.  相似文献   

18.
For the problem of precision and real time control in the process of sulfuration,a new control model is put forward.All the noise existing in the sulfuration process are unified as one kind noise named as extensive noise,and the control system is self-adaptive in the process.The purpose of this strategy is to solve the problem preferred.The model comprises of two parts: one is Neutral Networks which deals with the advance sort,the other is dynamic self-adaptive system which is used to find the system's factors.The simulation result of dynamic self-adaptive system shows that this extensive noise controlled model is valid in the process.  相似文献   

19.
Aiming at real time diagnostic knowledge accumulation and updating in intelligent diagnostic system, to simulate the process experts accumulate and update fault diagnostic knowledge, a new real time diagnostic knowledge self learning model is proposed based on pattern comparing and updating. Abnormal distribution test of hypothesis is used to compare real time equipment fault pattern to equipment normal pattern of contingent knowledge. The algorithm of sample size estimation algorithm is used to calculate the number of samples which is used to obtain necessary diagnostic efficiency. Real time model updating algorithm is used to adjust the diagnostic knowledge model to actual equipment on the spot. Analysis to actual test data of equipment shows that the method could achieve new diagnostic knowledge accumulation and be adaptive to actual equipment on the spot.  相似文献   

20.
In order to procure the optimum quality of control for full-controlled wireless mesh network, the primary influencing factor network time delay is analyzed. In order to get the optimum quality of control,the minimum network time delay should be acquired,and the algorithm of branch and bound is given to solve this problem. According to the numerical simulation, the quality of control for the whole network system with decreasing the delay time can be optimized by adjusting the number of nodes, the average transmission hop counts, and the probability of successful channel access and transmission for random nodes.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号