Unloading of excavation of foundation pit has influence on adjacent tunnels, therefore it is important to predict the deformation of metro tunnels to ensure the operation of tunnel. The displacement effect due to the surrounding wall soil unloading of adjacent excavation was not considered by the theoretical analysis method, and the analysis procedure of FEM was usually too complicated to get a satisfied result, so the horizontal and vertical additional stress were calculated by the Mindlin solutions. Furthermore, the tunnel structure was considered as the beam with infinite length. The additional stress was imposed on the Winkler model and the governing equation was built up on the adjacent tunnel structure. Finally, displacements and internal forces of existing tunnels were obtained. Compared with the numerical simulation and an engineering case, the results of the presented formula are in good agreement. It can provide certain theoretical and calculation basis for metro tunnels influenced by adjacent excavation.  相似文献   

2.
基坑复合土钉墙转角处有明显的空间效应,受力变形较小,对支护结构有利,但不清楚转角定量的有利影响范围,目前设计中仍按照与基坑中部一样保守设计,为在此范围内降低土钉用量,避免保守设计,对水泥土搅拌桩复合土钉支护结构建立了全尺寸整体三维有限元模型,这种模型包含基坑的转角,能考虑基坑的空间效应,通过建立接触面单元,能考虑土体和搅拌桩、土体和土钉的相互作用,量化分析了基坑转角对支护结构受力和变形的有利影响范围,计算结果表明,基坑转角对开挖面水平位移、地表沉降、坑底隆起、土钉轴力的有利影响范围分别约为1.3、1、1、1.2倍的开挖深度。经与实际工程现场实测值对比,验证了该模型分析结果的可靠性,同时分析结果优于平面二维和局部三维有限元模型,结论为复合土钉支护结构的优化设计和安全施工提供了理论依据和研究方法。  相似文献   

3.
以重庆东水门大桥—千厮门大桥渝中区连接隧道为研究对象,基于UDEC软件建立离散元数值模拟分析模型,研究了城区连拱隧道施工引起的地表沉降,上部建筑物基础沉降及倾斜,新建隧道下方已有轨道六号线的变形、受力特征,并将监测数据与数值模拟进行对比分析。结果表明,连拱隧道左侧隧道上导坑施工引起的隧道拱顶沉降和基础沉降量最大,经计算上部建筑物基础最大沉降量为3.81 mm,最大倾斜量为0.02%,建筑物基础沉降量和倾斜在规范许可范围之内;隧道施工引起的地层损失使得轨道六号线左拱肩向上隆起,六号线弯矩分布规律和其变形形态基本一致,弯矩最大值位于左拱肩部位,最大值为238 kN·m;数值模拟计算结果与监测数据量值相当,变形趋势基本一致;采用UDEC软件可以准确地计算出隧道开挖过程中节理的存在对隧道周围建筑物变形的影响。  相似文献   

4.
When shield crossed the sandy cobble stratum in Chengdu metro line 1, ground subsidence reached as high as dozens of times. The losing stability of excavation face caused excessive ground loss. Conditions of engineering geology and hydrogeology about sandy cobble stratum in Chengdu were analyzed. Mechanical characteristics of sandy cobble were obtained via large-scale triaxial test. According to the low cohesion and heavily discrete characteristics of sandy cobble, numerical computation was conducted by discrete element method. Based on numerical simulation of the large scale triaxial test, the micro parameters of the sandy cobble were calibrated. The influence of support pressure on shield excavation face deformation, surface settlement, max horizontal displacement and stress of soil was analyzed. The results show that: 1) Collapse pattern of excavation face by numerical simulation coincides with result of centrifuge model test in sand. 2) When supporting pressure is small, contact forces of particle in front of excavation face is low. The tendency of particle flow is apparent. Since over-excavation is easily brought out, cavity in the ground is caused after shield tunneling. 3)Soil arching effect in shield construction is obvious. Shield excavation forms cavity in deep ground and obvious earth surface collapse is not observed. This is main reason for lagged settlement phenomena of shield tunneling in Chengdu.  相似文献   

5.
To know well the impact on the deformation of underground diaphragm wall caused by soil excavation, centrifugal model tests reflecting Shanghai soft soil creep effects were designed, and finite element was used to calculate the deformation of underground diaphragm wall caused by different excavation timeline, sequence and width based on the top down construction method in the deep and large foundation pit of Shanghai Expo axis underground complex project. Centrifuge model tests and monitoring data indicate that the results of numerical calculation are approximately close to the horizontal displacement of the underground diaphragm wall measured in site, which reflects the deformation behavior of excavation. The results show that remained berm and middle plate have good control over the deformation of underground diaphragm wall. Most part of underground diaphragm wall deformation caused by soil creep occurs after the remained berm is excavated. So in order to decrease the deformation of underground diaphragm wall, it would be useful to conduct plate structures as soon as the remained berm is excavated. The excavation width of remained berm in the north part is less than that in the south part. It will be advisable to finally excavate the remained berm where there are protected objects nearby.  相似文献   

6.
When tunnels are through water bearing section of fractured rock mass, a complex interaction process between rock mass deformation and fluid transportation is one of the most important reasons for water gushing, water bursting and mud bursting.To study the rock mass deformation and fluid transportation in tunnel excavation under complex geological conditions, a hydraulic model of complex crack rock mass was established from the relationship between the crack growth degree of surrounding rock in deep buried tunnel and the engineering scale, with which fracture network of different levels in rock mass could be considered simultaneously.Furthermore,a computer Fortran program was put forward to simulate the solid fluid coupling of excavation process of a deep buried tunnel.And it was found that the principal fractures had strong flowing action and network fractures had storage function and lag effect in seepage area.And the yield area of surrounding rock was increased under the coupling of seepage field and stress field.  相似文献   

7.
为研究隧道锚的受力变形和锚碇承载特性等问题,在重庆几江长江大桥工程北岸现场开展1∶30缩尺模型试验。试验结果表明:从相似设计荷载240 kN到1 680 kN,双锚碇前锚面沿拉拔方向的最大位移平均值为0.020~0.808 mm,双锚碇前端上部地表岩体铅直方向的最大位移值为0.028~0.749 mm,双锚碇后端上部地表岩体铅直方向的最大位移值为0.014~0.645 mm;锚碇围岩破裂类型是拉剪复合型破坏;锚碇上方地表横桥方向参与抗拔作用的岩体范围约2~3 m,而沿锚碇轴向参与拉拔作用的岩体破坏区类似一个倒塞体形状;通过试验得到模型锚的可靠抗拉拔承载能力为1 344 kN;模型锚在840 kN下的流变趋于稳定,其长期安全系数为3.5。模型试验结果表明软岩地质条件下浅埋隧道锚具有较高的抗拉拔承载能力,证明此设计方案是可行的。  相似文献   

8.
Based on the elastic theory, an analysis can be made on stress and plastic deformation under tunnel excavation and shotcrete support.FLAC 3D can be used to simulate the mechanical behavior of excavation and support, getting the deformation of surrounding rock stress and plastic without support and shotcrete. The results show that, the prestress applied on the anchor equals to the supporting force when the tunnel plastic zone disappears. This support improves the self bearing capacity of surrounding rock, effectively suppresses the expansion of the plastic zone after the tunnel excavation, and prevents further damage to the tunnel surrounding rock.  相似文献   

9.
The dynamic elastic plastic finite element method was used to study the seismic performance of a slope protected by a soil nailing retaining wall. On the basis of working in parallel and interaction between loess and a flexible retaining wall, a 3 D nonlinear finite element method (ADINA) also was established. Rational earthquake excitation and damping were discussed for geological engineering. Horizontal and vertical excitations were considered simultaneously in the analyses. A model capable of simulating the nonlinear static and dynamic elastic plastic behavior of soil was used to model the soil, and a bilinear elastic plastic model having hardening behavior was used to model the soil nailing. A friction element was employed to describe the soil structure interaction behavior. Our research focused on the seismic performance of the horizontal and vertical slope deformation, soil nailing axial force, and earth pressure subjected to horizontal and vertical excitations. The results show that the seismic performance of slope protected by soil nailing is good; soil nailing axial force increases after an earthquake; permanent slope displacement occurs during an earthquake; and the peak earth pressure distribution during an earthquake is similar to the earth pressure before the earthquake. These conclusions can provide references for seismic analyses and design in soil nailing engineering.  相似文献   

10.
Through study of the rule of the air current between the metro stations which had installed the safety door system and the tunnel, this text established a physics model and a mathematics model, gained the mix coefficient which can marks the degree of the influence stopcock wind in metro inflict to the heat environment, exerting reasonable assumption and simplification, making use of the CFD imitation, adopting tracer air. The text elected three kinds of safety door system with different height to simulate and compare, gained the exact value of the mix coefficient, and simulated the energy consumption of subway air conditioning in different height of safety door by the mix coefficient.  相似文献   

11.
考虑桩基的剪切变形影响,利用单广义位移深梁理论,建立了桩基m法的计算方法,导出了水平位移、转角、弯矩和剪力的初参数表达式和无量纲参数函数的统一表达式,根据桩底边界条件建立了初参数解的计算公式;给出了无量纲参数函数随换算深度和弯剪刚度比的变化图形。研究表明,换算深度小于3.0时,弯剪刚度比对无量纲参数函数影响较小,换算深度大于4.0时,弯剪刚度比对无量纲参数函数影响的趋势非常明显,桩基剪切变形的影响程度与桩的边界条件有关。算例结果表明,桩身的剪切变形有增大桩顶水平位移、提高弯矩零点位置、改变弯矩分布特征、扩大桩侧土压力大小等影响。  相似文献   

12.
Recently, the construction of neighboring highway tunnels with small interval gets more and more in China. The construction of such tunnels proceeds usually by excavating one after another. The second tunnel is constructed with the surrounding rock disturbed by the first one. And the construction of second tunnel also has effect on the first excavated one. For revealing the interaction laws of such tunnel construction in combination with the engineering practice of Lanfeng tunnel at Jinshan Road in Chongqing, The FE numerical simulation analysis was used to study the characters of surrounding rock deformation, stress field, and plastic zone of the tunnel. From this analysis, it clearly shows that the excavation of second tunnel has significant influence on the first one. This study provides a scientific basis for design and excavation of neighboring highway tunnels.  相似文献   

13.
Deformation measurement and analysis play an important role in geotechnical model tests. Using the concept of quadrilateral isoperimetric element, the strain filed was achieved from the calculation method based on displacement modes, and the verification results show that this measurement technique has a reliable precision. The soil deformation in model test of square shallow foundation was measured by using this technique, and the results show that the measurement system based on digital image correlation method can realize the whole process quantitative measurement of soil displacement field and shear strain filed. This deformation measurement technique provides a tool for the qualitative and quantitative analysis of soil micromechanics characteristics.  相似文献   

14.
The 3D Goodman element is used to simulate segments' cracks in one section of shield tunnel in Guangzhou. Mechanical and deformation characteristics of segment structure responded to varied depth of cracks is analyzed in this paper. Meanwhile, research on coefficient of lateral earth pressure, soil coefficient and ground water level on mechanical and deformation characteristics is carried out. The research result shows that along with the increase of cracks' depth, the tensile stress, pressure stress reach the maximum value while the increment is not too much. However, when the depth equals to the thickness of segment, the reinforcements' tensile stress has increase sharply, even exceeded the allowable value. Moreover, the maximum number of tensile stress, horizontal and vertical convergent value of shield tunnel segment with cracks increase with the reduction of the coefficient of lateral earth pressure and soil coefficient, and increase with the increase of ground water level as well. Specific repair measure has been taken to segments' cracks in this section of shield tunnel based on the conclusions. In general, this section of shield tunnel is stable and safe now, and there is no longer new cracks appeared.  相似文献   

15.
According to the measurement during excavation of Jinzhou tunnel with four lanes in one cave which lies on the rebuilt highway from Shenyang to Dalian, this paper analyzes the rock deformation rule, discusses the reason of instability after a highway tunnel was excavated, emphasizes the necessity of the construction stability monitor and active control. The importance of support is Fresented with bolts and shotcrete to improve and enhance the carrying capability of the rock. It is necessary to insist on the rule of measurement and active control to ensure the safety and quality of tunnel construction.  相似文献   

16.
The influence of blasting vibration on the adjacent buildings is inevitable if blasting is employed for excavation. Daping station tunnel of Chongqing light railway project, on which there is dense with population and buildings, has a minimum buried depth of only four meters and maximum span length of 26.3 meters. The stepped excavation mode with short hole, multi round and V shaped cut are adopted. The maximum charge weight of one delayed interval is determined by the permitted vibration velocity. The smooth blasting technology with adding vibration reduction holes is used. Meanwhile, the charge weight per hole is strictly controlled. With the simulation and on site test, it is found that the proposed technology for tunnel construction is feasible.  相似文献   

17.
Rock is a kind of physical nonlinear complicated medium, under deep buried condition the surrounding rock system deformation shows geometrical nonlinear characteristic, and the interaction between the two nonlinear mechanism makes the unloading of surrounding rock system evolving complexly. Based on the Lagrangian method and large deformation caculation method, both the double nonlinearity and nonlinear dynamics character of deep buried tunnel surrounding rock system under unloading are studied. The numerical model results show that the Kolmogorov entropy has been extracted from the evolution data in the unloading process of surrounding rock system. The analysis indicates that the typical chaos character has been demonstrated in the process of unloading for deep buried tunnel surrounding system and the rock mass energy dissipation is analyzed at the stage of unloading.  相似文献   

18.
针对在深层开挖条件下进行自平衡法试桩时,通过采取有效措施消除开挖段的侧摩阻力影响后,由于深层覆土开挖卸荷导致工程桩桩周土体围压减小,从而导致荷载箱上段桩抗拔承载力降低这一问题,通过借鉴目前在抗拔桩方面已有的相关分析方法、负摩阻力、基底附加应力以及相关土力学基础理论,提出了基于Mindlin解的简化分析方法以及负摩阻力-附加应力法两种简化分析方法,并以北京某地铁车站中间柱下桩为例,分别估算深层开挖土体卸荷引起的上段桩承载力的损失值。两种方法所得出的估算值存在较大差异,对其原因进行了初步分析。两种简化分析方法的合理性及准确性还有待于进一步完善和实践验证。  相似文献   

19.
Considering the compression of medium and fluid, coupled vibration of saturated fractional derivative type viscoelastic soil and a circular tunnel with partially sealed shell lining in the frequency domain is investigated according to theories of Biot and elastic shell. The stress and displacement constitutive behavior of the soil skeleton is described by fractional derivative model which reflects the rheological properties of the medium while regarding soil as a liquid-solid saturated porous medium. The expressions of displacement, stress and pore water pressure are obtained while the inner boundary of circular tunnel is subjected to axially symmetric radial traction and axially symmetric fluid pressure respectively by introducing a partially permeable boundary condition. With the parameter analysis, it is revealed that the order of fractional derivative model on the responses for the system subjected to the symmetric radial traction is much greater than that of the system under the axially symmetric fluid pressure. And resonance phenomenon occurs obviously. Nevertheless the system responses do not have remarkable resonance phenomenon under axially symmetric fluid pressure.  相似文献   

20.
明甪直天王殿松木斗拱振动台试验研究   总被引:2,自引:0,他引:2  
以甪直保圣寺天王殿斗拱为参考对象,进行无缩尺松木斗拱模型的地震台试验研究。通过对斗拱的加速度与动力放大系数变化趋势、斗拱在振动过程中位移响应变化特征、斗拱变形最大时刻和各构件变形最大时刻的滑移位移和回转位移数值对比分析,得出以下结论:地震加速度用于衡量地震烈度,并不能直接反映斗拱试件的最大变形;振动频率的变化对斗拱回转变形的变化起重要作用,振幅是决定各构件水平滑移的主要因素;各构件变形最大值与斗拱整体变形最大值具有很强相关性,其中栌斗和华拱的回转变形对斗拱的整体变形而言,处于支配地位;斗拱的华拱连下昂部分主要起装饰作用,其榫卯连接节点位置在振动过程中较为薄弱,在对实际文物维护修缮过程中应引起重视并采取相关加固措施。  相似文献   