1.
电网发生大面积冰灾情况时,多条输电线路存在覆冰故障隐患,电网稳定运行受到严重威胁,需要提前制定输电线路融冰方案,合理安排融冰顺序。针对此问题,分析输电线路覆冰继续运行给电网带来的停电风险,将与待融冰输电线路相关联的变电站的电气主接线展开,将传统削负荷模型改进后应用于输电网与变电站主接线的组合网络,建立断路器可靠性模型,计算靠后融冰线路因继续运行的电网停电风险;利用计及风速及降雨影响的输电线路覆冰增长预测模型,计算输电线路的覆冰率,根据覆冰率门槛值确定待融冰线路集,基于覆冰严重度模型构建系统全局的覆冰指数指标;综合考虑电网停电风险及系统全局覆冰指数建立输电线路融冰紧迫度指标,动态更新待融冰线路并决策融冰顺序。最后,以IEEE RBTS系统进行算例分析,验证了所提方法的可行性与合理性。  相似文献   

2.
Photovoltaic power generation is considered to be one of the most promising power generation forms. It is difficult to accurately assess the reliability of the photovoltaic system (PVS) for the volatility and intermittent of the light intensity. By analyzing PVS component failure modes and their impacts on PVS output power, the reliability model of PVS is built. Then the probability model of PVS output power is presented by considering both illumination uncertainty and PVS component random faults. According to the influence of components random faults outside the intentional islands on the reliability of load points inside the intentional islands, the concepts of repair zone, isolation zone and zero zone are defined. Furthermore, by considering the fail-operation of breaker and fuse, the concept for zone hierarchy is proposed, and the analytical formulas to calculate reliability indices of the load points inside the intentional islands are deduced. The application of the presented reliability evaluation model is clarified using a typical example to show the practicality and validity of the proposed approach.  相似文献   

3.
With the increasement of the harmonic quantity in power system ,single phase harmonic power flow calculation can't meet the needs. This paper discusses the components model in detail under harmonic condition in three phase distribution power system, include generator,transformer,line and load. Particularly, the transformer model considers the winding connection, the phase shifting among primary and secondary windings, and the off-normal tapping.The three-phase model of transformer, used in traditional harmonic power flow, may the preuent the model from converging, so the paper proposes a three phase back forward sweep harmonic load flow algorithm based on phase-components. At last, a test example was used to prove the algorithm. The results indicate that the proposed method is efficient.  相似文献   

4.
The utilization of Flexible AC Transimssion System(FACTS)technology has significant impact on power system reliability performance.Series FACTS devices such as Thyristor Controlled Phase Shifting Transformers(TCPSTs) and Thyristor Controlled Series Compensators(TCSCs) can change the natural allocation of the power flow and effectively alleviate transmission congestion.Parallel FACTS devices such as Static Var Compensators(SVCs)can provide reactive power support and maintain voltage stability.So it is important to quantitatively evaluate their benefits to the power system reliability.The traditional models of the composite generation and transmission system reliability evaluation are mainly focused on conventional generation and transmission facilities.This paper researches the power flow model of TCPST and TCSC,and then presents the optimal load shedding model incorporating TCPSTs,TCSCs and SVCs and effectively incorporates them into the reliability evaluation model.The proposed method is tested on the RBTS and the obtained results show that the system reliability can be improved effectually by FACTS devices.  相似文献   

5.
风电并网时既要考虑系统的可靠性又要考虑输电阻塞。目前风电场容量可信度仅从可靠性单一角度提出。为此从输电阻塞角度提出了风电场容量可信度的定义;通过Monte Carlo法建立计及元件故障(发电机、线路和变压器)的风电场容量可信度模型,并提出该模型的二分法求解算法;同时还提出了风电阻塞指标以描述风电场并入电力系统对缓解系统输电阻塞的贡献。通过对修改的IEEE-RTS进行算例分析,验证了方法的正确性和实用性。结果表明:系统阻塞状况的缓解程度与并入风电场的位置有关,风电场容量可信度和风电阻塞指标相结合可以评价风电场并网对系统阻塞状况改善的有效性和经济性。  相似文献   

6.
The reliability and reality of load historical data is the foundation of load forecasting.But,the impact load in running power system,and the disturb data in collecting load data through the SCADA may cause much fault data in load historical data. Focusing on solving this problem, a method through adjusting amplitade of its wavele modulus maxima and processing the wavelet decomposed detail signal by soft threshold based on wavelet analysis and singularity theory, then fault date can be eliminated,so that,the real historical imformation and regulation data can be gained by load forecasting.  相似文献   

7.
The study for dealing with the load model in composite system reliability evaluation is almost at a standstill because of the inherent computational complexity. In this paper, an algorithm for composite system reliability evaluation considering load model is proposed. This method is powerful in computation because it can avoid unnecessary state enumeration by means of the relationship among basic reliability informations of load levels. As an example, the IEEE 24-node Reliability Test System is tested on VAX-11/750 computer. The average CPU time to calculate the reliability indices of the system corresponding to a load level is about 5 seconds.  相似文献   

8.
9.
A section algorithm of reliability evaluation for complex medium voltage Electrical Distribution Networks (EDNs) using adjacency multilist (AM) is proposed. The constructing method for AM is introduced. The AM can be used to store the structure data of EDNs and to solve the problem of space & time complexity. A new power flow algorithm of backward / forward sweep is proposed and a fast algorithm of forming sections in distribution network is put forward. The proposed algorithm makes a perfect combination of the power flow algorithm and the section algorithm of reliability evaluation, which makes efforts to decrease the work of programming and saves the computing time. Applying the proposed algorithm in RBTS-BUS6 system and actual EDNs, the reliability assessment results show that the algorithm has an advantage of saving time and possesses efficiency in engineering practicality.  相似文献   

10.
A reliability evaluation algorithm for middle voltage radial distribution network is presented. The algorithm applied ahead-searching-method to determining the area of breaker influencing, applied bidirectional-searching-method to determining faulting area, and applied behind-searching-method to determining connection switch. Then the type of nodes is determined. The reliability index of nodes,feerders and system can be easily computed by the type of nodes.So the computing effeciency is improved. At the same time, the curtailing load algorithms for low-voltage of buses and over-capacity of lines are presented and the foundation for the reliability assessment is established considering the power flow restriction. From the RBTS68-bus and other middle radial distribution networks,the effectiveness and availability of the method are verified.  相似文献   

11.
《保鲜与加工》2003,(10):52-55
This paper studies the question for considering optimal load curtailment in bulk power system adequacy evaluation. A minimization model of load curtailment is utilized for the contingency states which may have load curtailment. In order to calculate realistic bus indexes, two practical load curtailment philosophies are incorporated in the minimization model of load curtailment, which is achieved in computer program developed for bulk power system reliability evaluation. The minimization model of load curtailment, correlated algorithms, and flow chart of program are given in this paper. The effectiveness and availability of the model are verified from two case studies.  相似文献   

12.
An optimal active power adjustment model is deve in this paper for hybrid AC/DC systems after outage contingencies. The objective of the model is to minimize the rejection of load when some elements are out of service, with adjustment strategy approaching practical system operation. A large number of outage contingencies are simulated when the Monte-Carlo Method is emyloyed to evaluate the system reliability, requiring fast calculation of each simulation. The model and computer method proposed in this paper satisfy such a requirment because of the application of concentric relaxation, recursive branch constraint treatment in linear programming and a direct method for B-1 matrix modification. This paper is concerned with the simplified steady state conditions of the system based on DC load-flow, which implies the reliability indices calculated are the measures about static loss of load. The results for a 14-bus hybrid AC/DC system are given.  相似文献   

13.
The reliability is an important component part of research fields in power system. This paper presents an application of object oriented programming to develop reliability evaluation system of electric networks. A new approach to reliability evaluation and graph expression is proposed, and a computer aided decision making system of electric network reliability evaluation using Visual C++ 5.0 under Windows95 environment is developed. The system can provide reliability data for power system operation and plan, which is the foundation for operation and decision making. It has the characteristics of better expansibility, convenient usage, user friendly interfaces and so on.  相似文献   

14.
In the current unified standard for reliability design, it lacks full considerations of the range of load effect ratio for reliability analysis of light weight steel structures. Firstly, a computational method based on stress was proposed to calculate load effect ratio, which solves the problem that which kind of load effects can be chosen to calculate load effect ratio when the member fails with actions of several kinds of internal forces. Then, the range of load effect ratio was studied for light weight steel structures after some analyses of several members with this method. It is found that the load effect ratio of light weight steel structures can adopt large values under the disadvantage distributions of snow load. The reliability was also calculated for light weight steel structures designed with current partial factors. Its result shows that the reliability of light weight steel structure is low. Finally, the reliability was analyzed for light weight steel structures with different load effect ratios when snow load exceeded the design standard level. It indicates that the reliability is low for light weight steel structures with large load effect ratio. This provides some complementary explanations for the phenomena that the light steel structures are more likely to fail under snow disaster.  相似文献   

15.
A new method, based on the direct method of weighting multiple normal distri butions, is proposed to evaluate the production costs of two interconnected systems. It can be applied in calculation of expected power generation, reliability indexes and production coats of two interconnected systems without their load correlation. The effect of the linking line on the interconnection is also studied.  相似文献   

16.
The scheme of rapid protection will be possibly implemented by using the channel of communication, as the communication network of distribution power system being increasingly perfect and particular foundation of optical cable. The feeder protection based on communication can quickly and selectively isolate fault section and restructure the distribution network. This method is the direction of distribution automation. The action principles of feeder protection using blocking and allowing signals of directional over-current are analyzed. The directional over-current protection utilizing blocking signals is suitablefor distribution automation. The scheme can locate the fault section and instantly separate it. When feeder terminal unit (FTU) fails to act or communicate is interrupted, the feeder protection in the substation can backup.  相似文献   

17.
A novel shuffled frog leaping algorithm for ICPT power programming   总被引:1,自引:0,他引:1  
A new mode of inductively coupled power transfer (ICPT) is presented to city electrization traffic vehicle power supply optimization. The power supply distribution plan and ICPT technology are investigated. To avoid the local optimal of shuffled frog leaping algorithm (SFLA),a novel algorithm based on mutative scale chaos search and SFLA is presented. It is applied to inductively coupled power transfer substation optimal planning. The advantages of global and local search strategies for SFLA are combined with the proposed algorithm. In order to implement local refined search to improve local chaotic search ability and to enhance the solution accuracy, mutative scale chaos search is introduced to the proposed algorithm. The minimum annual expense of the proposed algorithm is 2.39% less than that of SFLA, which shows its advantage.  相似文献   

18.
The main means of the voltage-reactive power control of substation are adjusting the taps of load-tap-changing transformer or the reasonable capacity of parallel compensating capacitors according to the operation condition of substation.The "nine-area control strategy" is widely used to adjust voltage in the stated range and reduce the transmission capability of reactive power for power system at present.By analyzing the existent shortages of nine-area control mode for voltage-reactive power,an adjusting voltage calculation method is put forward,input data of which are the real time data of current,voltage and power of the substation.Then operation decision of voltage-reactive power control method of substation is made.By the simulating analysis,predigesting method of upper system is built,based on which an applied real time calculating model and calculating steps is given.  相似文献   

19.
The purpose of a power system is to deliver the power the customers require in real time, on demand, within acceptable voltage and frequency limit, and in a reliable and economic manner. Using NLPNN (New Linear Programming Neural Network) model, the behavior analysis of power system under fault conditions is carried through. The stability and convergence theorems are set up to obtain the resolution for the problem of the load curtailment strategy. A new way is open up to evaluate the reliability of power systems and the great progress in calculation analysis model is achieved. The new calculation technique and theory foundation of reliability evaluation are supplied.  相似文献   

20.
电网可靠性评估的网络静态等值模型分析   总被引:2,自引:0,他引:2  
为缓解大电网可靠性评估的计算复杂性,采取等值参数联合概率密度分布建模的方式开展了外网静态等值研究。在常规确定性静态Ward等值技术基础上,考虑外部区域发电机和线路随机故障,通过计算各种随机故障状态下的外网等值参数,即外网等值注入功率和外网等值串联支路阻抗,基于概率密度估计技术建立了等值参数的联合概率密度分布。外网静态概率等值模型克服了常规确定性静态Ward等值技术的不足,充分计入外网等值参数的随机性,减少了电网可靠性评估计算时间的同时提高了计算精度。对两区域RBTS系统和RTS79系统研究验证了其有效性和准确性。  相似文献   