首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Evaluation on Effects of the Change of Hole-boring Distance During Splitting Grouting to Earth Dam
Authors:WU Ke  MA Mingyue and SUN Yue
Institution:Geotechnical and Structural Engineering Research Institute, Shandong University, Jinan, Shandong 250061, P.R.China; Key Laboratory of Ministry of Education for Geomechanics and Embankment Engineering, Hohai University, Nanjing 210098, P.R.China;Shandong University of Science and Technology, Qingdao 266510, Shandong, P.R.China;China Petroleum Engineering Co. Ltd Geotechnical Engineering Company, Beijing 100085, P.R.China
Abstract:The technology of splitting grouting for earth dam is one of the important technical measures to improve the quality of dam. However, the consolidation mechanism of slurry in the dam is not clear, which can not evaluate the effects of seepage control of the dam after grouting. Therefore, assuming that the construction technology does not change and with the consideration of interaction between the layout of hole-boring distance and the effects of seepage control, the Mohr-Coulomb Hardening model and fluid-solid coupling method were used to analyze the rule of pore pressure, stress and strain in the dam during splitting grouting based on the finite element simulation. The consolidation mechanics was discussed and stability of the dam was evaluated.
Keywords:earth dam  splitting grouting  numerical simulation  fluid-solid coupling
点击此处可从《保鲜与加工》浏览原始摘要信息
点击此处可从《保鲜与加工》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号