水土保持方案落实阶段若干问题的探讨
引用本文:蔡陇海.水土保持方案落实阶段若干问题的探讨[J].中国水土保持科学,2014(1):102-108.
作者姓名:蔡陇海
作者单位:北京市昌平区水务局,北京102200
摘    要:近年来,生产建设项目水土流失防治工作在方案编制、审查、批复环节已经形成了十分完善的体系,但在水土保持方案落实阶段,却存在着与前期完善的编制、审查、批复体系不相适应的现象.结合近年来水土保持方案落实及验收工作的实践,通过分析水土流失防治措施设计的衔接保障、水土保持方案落实的机制保障、水土保持措施落实的奖罚机制,对水土保持方案落实阶段存在的问题进行分析和归纳,并提出对策和建议.

关 键 词:水土流失防治  预防为主  水土保持方案落实  对策和建议

Discussion on the implementation and inspection of soil and water conservation programmes
Cai Longhai.Discussion on the implementation and inspection of soil and water conservation programmes[J].Science of Soil and Water Conservation,2014(1):102-108.
Authors:Cai Longhai
Institution:Cai Longhai(Water Bureau of Changping District, Beijing City, 102200, Beijing, China)〈br〉
Abstract:In recent years,the soil and water loss prevention and control in production and construction projects have formed a sound system in programme formulation,review and approval; however,the implementation of programme phase is incompatible with the previous programme formulation,review and approval.Based on implementation and inspection practice of water and soil conservation programme in recent years,we analyze and summarize the problems in the programme implementation phase and put forward some countermeasures and suggestions by analyzing the linking warranty of soil and water loss prevention and control measures design,the guarantee mechanism of soil and water conservation programme implementation,and the reward and punishment mechanism of soil and water conservation measures implementation.
Keywords:soil and water loss prevention and control  prevention  soil and water conservation programme implementation  countermeasures and suggestions