首页 | 本学科首页   官方微博 | 高级检索  
     检索      

五岳水库除险加固工程主坝塑性混凝土防渗墙施工技术
引用本文:兰福江,张瑨.五岳水库除险加固工程主坝塑性混凝土防渗墙施工技术[J].信阳农业高等专科学校学报,2010,20(3):119-121.
作者姓名:兰福江  张瑨
作者单位:信阳市水利局,河南,信阳,464000
摘    要:根据塑性混凝土防渗墙在五岳水库除险加固工程主坝坝体和坝基防渗中的施工应用,介绍了五岳水库主坝塑性混凝土防渗墙的施工背景、施工方法、工艺流程、特殊情况处理、质量检查和施工效果。

关 键 词:水库除险加固  塑性混凝土防渗墙  施工

The Five Mountains reservoir eliminates the danger strengthening works main dam quaking concrete cut-off wall construction technique
LAN Fu-jiang,ZHANG Jin.The Five Mountains reservoir eliminates the danger strengthening works main dam quaking concrete cut-off wall construction technique[J].Journal of Xinyang Agricultural College,2010,20(3):119-121.
Authors:LAN Fu-jiang  ZHANG Jin
Institution:Jin(Xinyang Water Conservancy Bureau,Xinyang 464000,China)
Abstract:According to the quaking concrete cut-off wall in the Five Mountains reservoir except in the danger strengthening works main dam dam and the base of dam anti-seepage's construction application,introduced the Five Mountains reservoir main dam quaking concrete cut-off wall construction background,the job practice,the technical process,peculiar circumstance processing,the quality testing and the construction effect.
Keywords:The reservoir eliminates the dangerous reinforcement  Quaking concrete cut-off wall  Construction
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号