首页 | 本学科首页   官方微博 | 高级检索  
     检索      

三道湾水电站正常溢洪洞及泄洪排
引用本文:马振海,武维新,王国杰,梁宗祥.三道湾水电站正常溢洪洞及泄洪排[J].中国农村水利水电,2006,0(7):85-87.
作者姓名:马振海  武维新  王国杰  梁宗祥
作者单位:1. 西北农林科技大学水利与建筑工程学院,陕西,杨凌,712100
2. 甘肃省水电勘测设计院,兰州,730000
摘    要:试验表明,三道湾水电站原设计存在以下问题:泄洪排沙洞单独全开运行工况下,其进口上方存在贯通性吸气漏斗漩涡;正常溢洪洞进口侧收缩十分严重,泄流量不足,闸后存在水翅、折冲波等不良流态,下游消能效果不佳;针对实际情况,试验通过在泄洪排沙洞进口增设消涡格栅,在正常溢洪洞进口设置椭圆形导墙、延长闸后收缩段,下游采用扩散挑流消能等措施,很好地解决了上述问题。

关 键 词:水工模型试验  流态  漏斗漩涡  消能
文章编号:1007-2284(2006)07-0085-03
收稿时间:2005-10-14
修稿时间:2005年10月14

Experimental Study on Normal Spillway and Flood-Release & Sediment Sluice in Sandaowan Hydropower Station
MA Zhen-hai, WU Wei-xin, WANG Guo-jie, LIANG Zong-xiang.Experimental Study on Normal Spillway and Flood-Release & Sediment Sluice in Sandaowan Hydropower Station[J].China Rural Water and Hydropower,2006,0(7):85-87.
Authors:MA Zhen-hai  WU Wei-xin  WANG Guo-jie  LIANG Zong-xiang
Institution:1. College of Hydraulic and Architecture Engineering, Northwest University of Agricultural and Forestry Science and Technology, Yangling 712100, Shaanxi Province; 2. Gansu Provincial Institute of Hydropower Design, Lanzhou 73000
Abstract:Experiments show that there are following problems exist in the original design of the Sandaowan Hydropower Station: Transfixion funnel vortex happens at the inlet of the flood release sediment sluice;side contraction is serious at the inlet of normal spillway,and discharge is insufficient;water wing and refraction exist behind sluice,so the energy dissipation effect is not desirable.Aiming at the actual conditions,the problems are solved by adding vortex-elimination grid at the inlet of the flood-release and sediment sluice,installing ellipse diversion wall at the inlet of normal spillway,prolonging contraction reach behind sluice;and adopting diffusive trajectory energy dissipation downstream.
Keywords:hydraulic model test  flow pattern  funnel vortex  energy dissipation
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《中国农村水利水电》浏览原始摘要信息
点击此处可从《中国农村水利水电》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号