首页 | 本学科首页   官方微博 | 高级检索  
     检索      

九站松花江特大桥主墩承台沉井无封底砼施工的试验
引用本文:崔凌秋,孙宏志,刘伟.九站松花江特大桥主墩承台沉井无封底砼施工的试验[J].森林工程,2000,16(2):61-63.
作者姓名:崔凌秋  孙宏志  刘伟
作者单位:1. 吉林省高等级公路建设指挥部长吉高速公路建设办公室
2. 黑龙江省路桥五公司
摘    要:针对九站松花江特大桥特殊地质条件,主墩承台采用无封底混凝土沉井施工技术.确保工程质量,加快工程进度,降低工程成本.

关 键 词:大桥  主墩  承台  无封底混凝土  沉井施工
修稿时间:1999年10月11

Construction experiments of main pier with non-cover concrete in Jiuzhan SongHua River bridge
Cui Lingqiu,Sun Hongzhi,Liu wei.Construction experiments of main pier with non-cover concrete in Jiuzhan SongHua River bridge[J].Forest Engineering,2000,16(2):61-63.
Authors:Cui Lingqiu  Sun Hongzhi  Liu wei
Institution:Cui Lingqiu; Sun Hongzhi; Liu wei
Abstract:In the view of the special geologic condition of the Juizhan Songhuajiang river bridge. the pile cap of main pier uses sunk well construction technique which has no subsealing concrete to ensure the construction quality. quicken the progress of works. and reduce the construction costs.
Keywords:Major bridge  Main pier  Pile cap  Construction
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号