首页 | 本学科首页   官方微博 | 高级检索  
     检索      

泗阳第二抽水站反向发电可行性研究
引用本文:黄海田,莫岳平,周济人.泗阳第二抽水站反向发电可行性研究[J].中国农村水利水电,1995(7).
作者姓名:黄海田  莫岳平  周济人
作者单位:江苏省泗阳县泗阳闸站管理所,江苏省扬州大学农学院水利系,江苏省机电排灌工程研究所
摘    要:通过对泗阳第二抽水站的水力资源、反向发电运行方式的选择以及反向同转速发电的经济效益等的综合分析,得出泗阳二站反向同转速发电在技术上可行、经济上合理的结论。同时,提出了反向同转速发电方式应采取的技术措施。

关 键 词:泵站  反向发电  可行性

Feasibility Study of Inverted Power Generation of the Siyang Second Pumping Station
Huang Haitian, Mo Yueping, Zhou Jiren.Feasibility Study of Inverted Power Generation of the Siyang Second Pumping Station[J].China Rural Water and Hydropower,1995(7).
Authors:Huang Haitian  Mo Yueping  Zhou Jiren
Abstract:The conclusion of technically fcasibility and economically reasonableness of same speed inverted power generation of the Siyang second pumping station has been obtained by a comprehensive analysis of hydro-power resources, inverted power generation operating pattern and economic benefit of same speed inverted power generation of the Siyang second pumping station. Meanwhile, the technical measures which should be adopted at same speed inverted power generation are presented.
Keywords:pumping station  inverted power generation  feasibility  
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号