摘    要:为了研究上游有调洪水库的小流域洪水过程,在确定下游河道洪水流量应包括区间洪水流量和水库泄洪流量的基础上,通过将流域洪水的主峰过程概化为且角形变化过程的方法,得出了错峰时间的计算公式,从而,提出了小流域洪水计算的简化方法。

关 键 词:调洪水库  洪水过程  小流域  错峰时间  防洪工程  堤防
修稿时间:2002年12月29

Calculation of Flood Process for Small Basin with Flood-Regulation Reservoir Upstream
Song Donghui,Xu Jing.Calculation of Flood Process for Small Basin with Flood-Regulation Reservoir Upstream[J].China Rural Water and Hydropower,2003(5):38-39.
Authors:Song Donghui  Xu Jing
Abstract:In order to research flood process of small basin with flood_regulation reservoir upstream, peak_time_staggering calculation formula are deduced on the basis of confirmation that the flood discharge of downstream river is composed of local flood and reservoir discharge, through generalization of the main flood peak process into triangle process. The simplifying method for small basin flood calculation is proposed.
Keywords:flood-regulation reservoir    flood process    small basin    peak-time staggering  