首页 | 本学科首页   官方微博 | 高级检索  
     检索      

水泥工业项目水土保持准入条件
引用本文:赵永军,党维勤,陈吉虎,徐成.水泥工业项目水土保持准入条件[J].中国水土保持科学,2010,8(3):104-107.
作者姓名:赵永军  党维勤  陈吉虎  徐成
作者单位:1. 水利部水土保持监测中心,100055,北京
2. 水利部黄河水利委员会绥德水土保持科学试验站,718000,陕西绥德
3. 北京水保生态工程咨询有限公司,100055,北京
基金项目:国家财政部、水利部2008专题"开发建设项目水土保持准入条件研究" 
摘    要: 通过对水泥工程的类型、组成、占地以及施工和生产工艺、土石方量及弃渣的分析,总结出水泥工程在建设与生产过程中的水土流失特点,水泥工程在建设期间的水土流失重点区域是厂区,而在生产运行期则是石灰石和黏土矿,此外在水泥生产厂区还会产生大量的粉尘。水泥工程除了应遵循"生产建设项目水土保持准入条件通用条款"中的条件外,对照涉及水泥产业的法律、法规、规范、政策、标准、发展纲要和行业发展规划,提出了水泥工程项目的否决、限批和缓批的13条水土保持准入条件。根据水土保持新国标和有关法规的规定,结合典型案例分析,提出须修正主体设计的5项准入条件和须修改水土保持方案的4项准入条件。

关 键 词:水泥工业  水土保持  准入条件  工业项目  水土保持方案

Permitted requirements of soil and water conservation for cement industry projects
Zhao Yongjun,Dang Weiqin,Chen Jihu,Xu Cheng.Permitted requirements of soil and water conservation for cement industry projects[J].Science of Soil and Water Conservation,2010,8(3):104-107.
Authors:Zhao Yongjun  Dang Weiqin  Chen Jihu  Xu Cheng
Institution:1.Monitoring Center of Soil and Water Conservation,MWR,100055,Beijing;2.Suide Soil and Water Conservation Scientific Experimental Station of YRCC,718000,Suide,Shaanxi;3.Beijing Shuibao Eco-engineering Consultation Co.,Ltd,100055,Beijing: China)
Abstract:Based on the analysis of types,components,land occupation,production technology,earthwork and waste involved in cement inductry projects,the characteristics of soil erosion and water loss during the construction and manufacturing procedure of cement works are shown.Soil erosion and water loss mainly occur during the construction of cement works while during production,it is mainly the exploitation of lime and clay and the dust released in the factory.According to the "universal items of the permitted requirements of soil and water conservation for construction and production projects" in reference to the related laws,rules,regulations,policies,codes,development guidelines and industry development program in cement industry,13 items of permitted requirements of soil and water conservation are put forward in this research for rejection,restricted approval and delayed approval of cement industry projects.On the basis of related laws and regulations and the new national code for soil and water conservation and in light of analysis of typical cases,5 items of permitted requirements are put forward in this research that required the revision of the main-building design,and 4 items that required the revision of the soil and water conservation plan.
Keywords:cement industry  soil and water conservation  permitted requirement  industry project  soil and water conservation plan
本文献已被 维普 万方数据 等数据库收录!
点击此处可从《中国水土保持科学》浏览原始摘要信息
点击此处可从《中国水土保持科学》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号