首页 | 本学科首页   官方微博 | 高级检索  
     检索      

Parameter Modifiability Based Transformer Substation State Estimation
作者姓名:CHENG Tong  YAN Wei  WEN Yu  DU Peng
作者单位:1. College of Electrical Engineering, Chongqing University, Chongqing 400030, China ; 2. Dispatching Department, Chongqing Electric Power Dispatching Center, Chongqing 400014, China; 3. Guangzhou Power Supply Administration, China Southern Power Grid Com
摘    要:The accuracy of transformer substation state estimation is widely low,and one reason of that is inaccurate(parameter) of model.Recently,most of papers about state estimation(SE) focus on improving algorithm.Based on classic SE and parameter estimation(PE),this paper takes advantage of the methods that putting parameters into state vector and putting parameters both into state vector and measurement vector in discussing the influence of parameter on transformer substation SE via simulation.The result of simulation shows: First,the error of parameters will be too high if only putting them into state vector,although the result of SE will be much better.Second,putting parameters both into state vector and measurement vector and giving them appropriate coefficient will lead a better result that can be used by engineering.

关 键 词:transformer    state  estimation    parameter  estimation
收稿时间:2005/11/18 0:00:00
修稿时间:2005/11/18 0:00:00

Parameter Modifiability Based Transformer Substation State Estimation
CHENG Tong,YAN Wei,WEN Yu,DU Peng.Parameter Modifiability Based Transformer Substation State Estimation[J].Storage & Process,2006(3):32-35.
Authors:CHENG Tong  YAN Wei  WEN Yu  DU Peng
Institution:1. College of Electrical Engineering, Chongqing University, Chongqing 400030, China ; 2. Dispatching Department, Chongqing Electric Power Dispatching Center, Chongqing 400014, China; 3. Guangzhou Power Supply Administration, China Southern Power Grid Com
Abstract:The accuracy of transformer substation state estimation is widely low,and one reason of that is inaccurate(parameter) of model.Recently,most of papers about state estimation(SE) focus on improving algorithm.Based on classic SE and parameter estimation(PE),this paper takes advantage of the methods that putting parameters into state vector and putting parameters both into state vector and measurement vector in discussing the influence of parameter on transformer substation SE via simulation.The result of simulation shows: First,the error of parameters will be too high if only putting them into state vector,although the result of SE will be much better.Second,putting parameters both into state vector and measurement vector and giving them appropriate coefficient will lead a better result that can be used by engineering.
Keywords:transformer  state estimation  parameter estimation
点击此处可从《保鲜与加工》浏览原始摘要信息
点击此处可从《保鲜与加工》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号