矿山复垦保证金测算方法综述及改进
引用本文:程琳琳,马逯,付亚洁.矿山复垦保证金测算方法综述及改进[J].农业工程学报,2016,32(7):224-229.
作者姓名:程琳琳  马逯  付亚洁
作者单位:中国矿业大学 北京 地球科学与测绘工程学院,北京,100083
基金项目:国家自然科学基金项目资助(41401637);国家留学基金资助(201406435027)
摘    要:为分析中国矿山复垦保证金测算方法存在的问题,提出科学合理的方法,以促进保证金制度的健康发展。该文对国内外的测算方法进行了总结及对比分析,结果表明:国际上的成功实践及理论界的研究均证实应依据复垦成本测算保证金,但实践中,中国各地测算方法不一,且测算出的数额往往低于复垦成本,影响了保证金制度的公平性和有效性;理论界测算复垦成本的方法可分为两类,即通过对"标准费用"的修正测算复垦成本及将复垦过程中发生的各种费用加总测算复垦成本,这2种方法均不能兼顾客观性、科学合理性及可操作性。应将各地保证金的测算依据统一为复垦成本;针对已有测算方法的不足,该文进而从导致矿山复垦成本发生差异的根本原因入手,提出了基于土地破坏主导因子的测算方法并构建了测算模型,为以复垦成本为依据统一全国的测算方法提供了理论支持。

关 键 词:土地复垦  矿山  模型  保证金  复垦成本  测算方法
收稿时间:2015/10/15 0:00:00
修稿时间:2016/2/24 0:00:00

Review and improvement of calculation method for mine reclamation bond
Cheng Linlin,Ma Lu and Fu Yajie.Review and improvement of calculation method for mine reclamation bond[J].Transactions of the Chinese Society of Agricultural Engineering,2016,32(7):224-229.
Authors:Cheng Linlin  Ma Lu and Fu Yajie
Institution:College of Geoscience and Surveying Engineering, China University of Mining and Technology , Beijing 100083, China,College of Geoscience and Surveying Engineering, China University of Mining and Technology , Beijing 100083, China and College of Geoscience and Surveying Engineering, China University of Mining and Technology , Beijing 100083, China
Abstract:Abstract: As an effective way to promote reclamation in mining area, reclamation bond system has been adopted by western countries as early as 1970s. China has also adopted this system in recent years. As it is relatively new, there are still many aspects that need to be improved. The core of the system is how to calculate the amount of bond. If the size calculated is too small, there will be a huge capital gap and great financial burden for the government and community to reclaim the mining site once the mining enterprise escapes the reclamation obligation. If the size calculated is too big, it will restrict the mining capacity and affect economic development. The purpose of this paper is to analyze the problems of the calculation methods in China to find out a scientific and reasonable method to promote the healthy and sustainable development of mine land reclamation bond system. Calculation methods in practice and academia at home and abroad are summarized and contrasted. The result shows that it has been confirmed by international successful practice and theory research that mine land reclamation bond should be calculated according to land reclamation cost. While calculation methods in practice differ greatly in China, and the amounts calculated are often below the reclamation costs, which has affected the fairness and effectiveness of the bond system. Methods of calculating reclamation cost in academia can be divided into 2 categories. One method is to calculate reclamation cost by modifying the 'standard cost'. The other method is to calculate reclamation cost by adding up all of the reclamation fees occurring during the process of mining site reclamation. Both of the 2 methods cannot give consideration to objectivity, scientific rationality and operability at the same time. It is concluded that the bond's calculation basis for each province should be unified as reclamation cost to guarantee sufficient reclamation fund. Aiming at the deficiency of existing calculation methods, this paper puts forward the calculation method and model of the coal mining reclamation bond based on the leading factors affecting land destruction. Firstly, the causes of land destruction by coal resource mining are analyzed and the general factors (the thickness of coal seam, the slope of the terrain, the mining method etc.) affecting the form and degree of land destruction are identified. Secondly, the leading factors affecting land destruction are determined by analyzing the correlation degree between land destruction and general factors. Thirdly, the leading factors are graded and each grade is given a value respectively. And their weights are determined. The coal mining is assessed through the comprehensive condition index of the leading factors affecting land destruction, which is the product of the value of the grade and the weight of the leading factors. The model of the corresponding relationship between the index and the reclamation cost is constructed through the inductive analysis of the reclamation cases. The corresponding reclamation cost per comprehensive condition index is determined. At last, the calculation model of the bond is built by multiplying the total index, the corresponding reclamation cost per comprehensive condition index, the unforeseeable fee, the inflation rate and the destruction area of the calculation unit. Compared with existing calculation models, this model is more objective, scientific and easier to operate. It provides a theoretical support for the unification of calculation methods of reclamation bond based on reclamation cost throughout the country.
Keywords:land reclamation  mines  models  deposits  reclamation cost  calculation method