首页 | 本学科首页   官方微博 | 高级检索  
     检索      

基于MlKE11水动力模型的大洋河丹东有堤段行洪能力分析
引用本文:冯金鹏.基于MlKE11水动力模型的大洋河丹东有堤段行洪能力分析[J].农业科技与装备,2016(3):30-32.
作者姓名:冯金鹏
作者单位:辽宁省水利水电科学研究院,沈阳,110003
摘    要:河道现状行洪能力是河道所在地区防洪安全的核心,也是防汛主管管部门汛期指导防汛的重要依据。为分析大洋河丹东有堤段的行洪能力,采用水动力模型MIKE11计算、模拟河道及河网的一维洪水演进过程,准确判断其行洪能力,为保护沿岸居民防洪安全提供理论基础。

关 键 词:行洪能力  MIKE11模型  模拟  一维洪水演进

Analysis on Flood Discharge Capacity of Dayang River Dandong Section with Dyke Based on MIKE11 Hydrodynamic Model
Abstract:Flood discharge capacity of watercourse status is the core of flood control safety in the watercourse area, and is also as an important basis for flood prevention authorities directing the work of flood prevention during flood season. In order to analyze the flood discharge capacity of Dayang River Dandong section with dyke, we used hydrodynamic model MIKE11 to calculate and imitate one-di-mensional flood routing process of watercourse and river network, and estimated the flood discharge capacity correctly, providing the theoretical basis for preventing coastwise residents flood control safety.
Keywords:flood discharge capacity  MIKE11 model  imitation  one-dimensional flood routing
本文献已被 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号