首页 | 本学科首页   官方微博 | 高级检索  
     检索      

泵站单机组变速运行优化方法研
引用本文:程吉林,张礼华,张仁田,龚懿,朱红耕,邓东升.泵站单机组变速运行优化方法研[J].农业机械学报,2010,41(3):72-76.
作者姓名:程吉林  张礼华  张仁田  龚懿  朱红耕  邓东升
作者单位:1. 扬州大学水利科学与工程学院,扬州,225009
2. 扬州大学水利科学与工程学院,扬州,225009;江苏省水利勘测设计研究院有限公司,扬州,225009
3. 南水北调东线江苏水源有限责任公司,南京,210029
基金项目:"十一五"国家科技支撑计划资助项目,国家自然科学基金资助项目,江苏省高校自然科学研究资助项目,教育部博士点基金资助项目 
摘    要:考虑峰谷电价与站下水位变幅等因素,提出了以日开机运行总耗电费用最少为目标函数,各时段水泵转速为决策变量,规定时段内抽水总量为约束条件的单机组变速优化运行动态规划模型.对江都四站单机组变速优化运行与恒速运行进行了比较分析,结果表明:满负荷工作时,无论是否考虑峰谷电价,变速带来的效益不足以抵消安装变频装置产生的耗损;考虑峰谷电价、非满负荷工作时,效益明显;不考虑峰谷电价情况下,80%和60%负荷工作时,变速节省的电费偿还相应配套功率的变频装置投资约需15~18年和7~10年.

关 键 词:泵站  单机组  变频变速  优化

Methodology of Single-unit Variable Speed Operation in Pumping Station
Cheng Jilin,Zhang Lihua,Zhang Rentian,Gong Yi,Zhu Honggeng,Deng Dongsheng.Methodology of Single-unit Variable Speed Operation in Pumping Station[J].Transactions of the Chinese Society of Agricultural Machinery,2010,41(3):72-76.
Authors:Cheng Jilin  Zhang Lihua  Zhang Rentian  Gong Yi  Zhu Honggeng  Deng Dongsheng
Institution:1.College of Hydraulic Science and Engineering/a>;Yangzhou University/a>;Yangzhou 225009/a>;China 2.Jiangsu Surveying & Design Institute of Water Resources Co./a>;Ltd./a>;China 3.Jiangsu Water Supply Co./a>;Ltd.for S-to-N Water Diversion Project/a>;Nanjing 210029/a>;China
Abstract:A dynamic planning model for single-unit pump variable speed optimal operation was developed in which peak-valley electricity prices and variable water levels in down-stream were considered.In this model,the minimum electricity consumption cost in one-day operation was the objective function.The speed of pump was a decision variable and specified pumping water volume was the constraint.A comparison between optimized variable speed and fixed speed operations of a single-unit in Jiangdu No.4 Pumping Station w...
Keywords:Pumping station  Single-unit pump  Variable speed operation with VFD  Optimization
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《农业机械学报》浏览原始摘要信息
点击此处可从《农业机械学报》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号